As we’ve gone through the independent facilities assessment, one thing that really stands out is the difference between the needs identified at North Lyon County Elementary and Northern Heights.
NLC has maintenance needs. Northern Heights has a much longer list of aging systems and larger facility concerns.
Here are just a few of the items identified in the assessment:
The school does not have a FEMA-rated storm shelter, and the current below-grade locker room shelter is not handicap accessible.
There are ADA concerns with the path to the athletic field, the concession/restroom building, and emergency notification systems.
Some of the mechanical equipment serving West Hall dates all the way back to 1955, and other rooftop units are past their expected life.
The track, which dates back to 2000, is in poor condition and has ongoing drainage issues. The press box also has significant deterioration, including holes in the walls and ceiling.
There are roof issues, including seam gaps and failed caulking, along with interior ceilings and soffits showing sagging, chipping and exposed gaps.
The assessment also identifies concerns with plumbing, shower piping, welding exhaust, handwashing stations, and ventilation in the FACS classroom.
These aren't just cosmetic issues. They represent years of aging infrastructure and systems that are becoming increasingly difficult to maintain.
We think it's important for our community to see the information for themselves. This isn't about saying NLC doesn't have needs. It does. The assessment simply shows that the scope and age of the needs at Northern Heights are very different.
Our goal as USD 251 Together is to share the information, answer the questions we can, and help our community understand what is being proposed before November 3.
Look at the facts. Ask questions. Come to a tour. Be informed




